Laserfiche WebLink
STI SP001 Annual Inspection checklist <br /> Gene mf Ins action Information: - <br /> e�—)1 - 1 q Remin Unfit Dam: (aa months here inspection dafh" <br /> Inspection Data: / ll <br /> Prior lnspacnon Date: (0 lmmedor Name: <br /> Tanks Inspected(ID xs): <br /> Inspection Guidance: <br /> a For equipment not included In this Standard,follow the manufacturer reminmended Inspectionl25tlng schedules and procedures. <br /> D The periodic AST Inspection is intended for monitoring the external AST condition and its containment stnitlure This visual inspection does not require a Certified <br /> Inspector. It shall be performed by an owner's inspector who Is familiar with thee-site and can identify changes and developing problems. <br /> ➢ Remove promptly upon dui standing water at liquid in the primary tank,secondary containment area.interstice,or spill container. Before discharge to the <br /> anvimnment,inspect the liquid for regulated products or other writer <br /> and disposed of it Properly. <br /> > In o,der to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules, a facility must regularly,test liquid level sensing devices to ensure proper <br /> operation(40 CFR 112.8(o(S)(v)). <br /> ➢ ' ('j designates an item in a non-conformance status.This indicates that action is required to address a problem. aCerfifled Inspector,oratank <br /> NoMrim ring ifams'mo rant to tank containment integrity require evalurtion by an engineer experienced it.AST design, p <br /> manufacturer who will determine the corrective action.Note the nonconformance and correspondingcolractivaaction in the comment motion <br /> Y Retain the completed checklists for 36 months. <br /> a Complete this checklist on an annual basis supplemental to the oWnecmonihty-peromretl inspection checklists. <br /> ➢ Note: If a change has occurred to the tank system or containment that may affect the SPCC.plan,the condition should the avaluafed against m¢surrent <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> ]Win <br /> kC <br /> Task Status Comments <br /> 1.0 Tank Containment 'yesNo N/A <br /> 1.1 Check for. <br /> structure <br /> • Holesnrcracks i <br /> containment wallt <br /> or floor <br /> • Washout <br /> • Linerdegmdation <br /> • Corrosion <br /> • Leakage <br /> • Paint failure <br /> • Tanksetdfn <br /> 2.0 Tank Foundationand Su orts Y No <br /> 2.1 Foundation Setllsmant or <br /> foundatIon washout? <br /> 2.2 Conaefe Pad Craddng orspalling? - <br /> ornrgwall _.. <br /> SEPTEMBER 2011 <br /> AST INSPECTION STANDARD <br /> CCPYRIGFfTs32011 Steel Tank Institute <br />