Laserfiche WebLink
a Make sure fusible Y No' N/A <br /> element a in place <br /> and correctly <br /> catered. <br /> d.Be sum test ports No` WA <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fature <br /> or component remains <br /> connected to valve. <br /> 5.31nterstitial Check condition of Y ' No" NIA <br /> leak detection equipment,including: <br /> equipment • The window is <br /> clean and clear in <br /> sight leak gauges. <br /> Thewire <br /> connections of <br /> elechonic uges <br /> for tightnessgaand <br /> oon-on <br /> Activate the test <br /> button. If <br /> a licabie. <br /> 5.4 Spilla.if corrosion, Yes' W <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability Dfthe unit to <br /> perform spill <br /> contairmenlfunotions. <br /> re lace the unit. <br /> b.Inspect the Y No NIA <br /> connections to the <br /> A5T for tightness, as <br /> well as the bolls, <br /> was,washers for <br /> condition and replace <br /> if necessa <br /> c.Drain valves must Yes` No <br /> be operable and <br /> closed <br /> 5.5 Simmer a.Check met the Yes No` N! <br /> strainer Is clean and in <br /> cod coni fion. <br /> AST INSPEGUCN STANDARD 11 SEPTEMBER2011 <br /> COPYRIGHTC12011 Steel Tank Institute <br />