Laserfiche WebLink
1 <br /> STI SP001 Monthly Inspection Checklist <br /> General Ins ection Information: — <br /> Ej �Ie ��' Retain Untll Date: (26 months from inspection date) <br /> Inspection Date: ! 0 <br /> G/Z( �Q Inspector Name: <br /> Prior lnsp¢dipn Date: OO - <br /> Tanks InspeGetl(ID#s) <br /> Inspection Guidance: <br /> D urer recommended inspeclioNlestinFi schedules and procedures. <br /> For equipment not included in this Standard,follow the manufact <br /> > The periodic AST Inspection is intended for monitonng the oasmal AST condition and its containment structure.This visual inspection does not require a Cedifed <br /> s. <br /> Inspector. It shalt be performed by an owner's inspector who is familiar with^`e5ticeite aor spill coma nend can idem� q remove promptlnges and y or take otheping mwrrective aclioo.Before <br /> D Upon discovery of water in the primary tank,secondary containment area, <br /> discharge to the environment,inspect the liquid far regulated products or other contaminants and disposed of d properly. <br /> > (•)tlesignates an item in anon-conformance status.This indicates that action is required to address a problem. a CeNfied Ins actor,or a lank <br /> D Non-conforming items-Important t tank <br /> to nment integrity require evaluation by an engineer earned need in AST design, P <br /> manufacturer who will determine the corrective action.Note the non-crimmi,noe and corresponding corrective action in the comment section. <br /> > Retain in.completed checklists for 36 months. <br /> > In file <br /> event of severe weather(snow,ice,wind stones)or maintenance(such a painting)that could equip he operation of criticalcomer the <br /> (normal and emergency vents,valves),an inspection of these components is required as soon as the equipment rs saialy access Yble after the event. <br /> em <br /> Task Status Comments <br /> 1.0 Tank Containment <br /> Yes" o <br /> 7.1 Containment Check for water, <br /> structure debris,cracks or hre <br /> hazard o <br /> L2 Primary tank Check for water Yes" No 1 <br /> 1 3 Containment Operable and in a Yes o" I)o flraz, S <br /> drain valves closed Cairion ) <br /> 1A Pathways and Clear and a No' <br /> entry gates/doors WA <br /> o arable <br /> 2.0 Leak Detection Yes' <br /> 2.1 Tank Visible signs of No <br /> leaka e <br /> 2.2 Secondary Visible signs of Yes" ok�o <br /> Containment leakage from into <br /> Into secondary <br /> containment <br /> 2.3 Surrounding Visible signs of Yes* fi Do en V.S� <br /> SDI] leeks WA <br /> 2.4 interstice Visible signs of YesN 0 _1S ` ���.c� <br /> leaks e <br /> AST INSPECTION STANDARD <br /> 4 SEPTEMBER 2011 <br /> COPYRIGNT02D11 Steel Tank Institute <br />