Laserfiche WebLink
.._ _.......... . <br /> STI SP001 Annual Inspection Checklist <br /> General Ins action Information: <br /> E <br /> Date: /} Re[aln Until Date: (36 months from inspection tlate) <br /> ion Date: Inspector Name: <br /> cted <br /> Inspection Guidance: <br /> > For equipment not'mclutletl in this Stantlard,follow the manuhactuor recommended inspectiorj esting schedules and procedures. <br /> n The periodic AST Inspection is intentletl for monitoring the extemel AST condiflon and its containment structure.This visual inspection does not require a Cert:fietl <br /> Inspector.Ii shall be performed by an owner's inspector who is familiar with the site and can identify changes tersOcey,eolopin9 problems. <br /> Before tlischargeto the <br /> Y Remove promptly up on discovery standing water or lig uid in the primary tank,secondary containment area, spill <br /> environment,inspect the liquid for regulated products or M Ianontaminants and disposed of tpropedY <br /> mustre alert test liquid level sensing devices to ensure proper <br /> > In order to comply <br /> with EPA SPCC (Split <br /> Prevention,Control and Countermeasure)rules, facility g Y q <br /> operation(40 CFR tt 2.Blc)(B)(v)J. <br /> > (")designates an it <br /> in anon-conformance status.This indicates that action is required to address a problem. <br /> > Nan-conforming items' p rte tt i k m conta'nmen'integrity require evaluation by an engineer expenenced in AST design,a Cenified Inspector,ora tank <br /> manufacturer who will determine tine conective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> Y Retain the complotetl checklists for 36 months. <br /> > Complete Th <br /> is checklist on an annual basis supplemental to the or <br /> monthly-performed inspection checklists.ndition should be evaluated against tine current <br /> v Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> Item Task Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment Check for: Yes" No /A i <br /> structure . Holesorcracksin <br /> containment well <br /> or floor <br /> . Washout <br /> . Linerdegradafion <br /> Corrosion <br /> . Leakage <br /> . Paintfuture <br /> Tanksetting <br /> 2.0 Tank Foundation and Supports No <br /> 2.1 Foundation Settlement or tiiO �hra�g� <br /> foundation washout? <br /> 2.2 Concrete pad Cracking or spaisi Yes" No <br /> or ring wall <br /> AST INSPECTION STANDARD 8 SEPTEMBER 2011 <br /> COPYRIGHT©2011 Steel Tank Institute <br />