Laserfiche WebLink
.. _............... .... . .. . <br /> 5.2 Valves Check the contlrtion of No n1b..t-r�- — <br /> all valves far leaks, 6 <br /> corrosion and. <br /> dam@ e. <br /> 5.2.1 Anti siphon, Cycle the valve open Y No' N/A <br /> check and and closed and check <br /> ate valves for ro ero eration. <br /> 5.22 Pressure Check for proper No" N/A <br /> regulator operation.(Note that <br /> valve there may be small, <br /> 114 inch drain plugs in <br /> the bottom of the valve <br /> that are not visible by <br /> looking from above <br /> onl <br /> 5.2.3 Ex anion Checc that the valve k Yes No' N/A <br /> relief valve in the proper <br /> Orientation.(Note that <br /> fuel must be l <br /> discharged back to the <br /> tank via a separate <br /> pipe or tubing.) <br /> 5.2.4 Solenoid Cycle power to valve Yes NO II <br /> valves to check operation. j <br /> (Electrical solenoids <br /> can be verified by <br /> listening to the plunger <br /> opening and closing. It <br /> no audible <br /> confirmation,the valve <br /> should be inspected <br /> for the presence and <br /> operation of the <br /> uirer <br /> 5.2.5 Fire and a.Manually cycle the a No' NIA <br /> shearvalves valve to ensure <br /> components are <br /> maving freely and that <br /> the valve handle or <br /> lever has clearance to <br /> allow valve to close <br /> completely. <br /> It.valves must not be Ye No` NIA <br /> wired in o en 2osftion. <br /> ASI INSPE070M STANDARD 10 SEPTEMBER 2011 <br /> COPYRIGHT©2011 Steel Tank Institute <br />