Laserfiche WebLink
c.make sure fusible No` N/A <br /> element is in place <br /> and Correctly <br /> positioned.. No" N/A <br /> d. Be sure test pars <br /> are sealed with plug <br /> after testing is <br /> complete,and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3Int eStitial Check condition of Y s Not N/A <br /> Is defection equipment,including: <br /> equipment • The window is <br /> clean and clear In <br /> Sight leak gauges. <br /> The wire <br /> connections of <br /> electronic gauges <br /> fortiohtness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a licable. <br /> SA Spill a.If corrosion, Yes' No <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability ofthe unitto <br /> perform spill <br /> containment functions, <br /> re lace the un@. <br /> b.inspect the No NIA <br /> connections to the <br /> AST for lightness, as <br /> .11 as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> it necessa . <br /> c, Drain valves must Yes' No NI <br /> be operable and <br /> closed <br /> 5.5 trainer a,Check that the Yes No` <br /> strainer is clean and in <br /> oad condition. <br /> AST INSPECTION STANDARD 1 SEPTEMBER 2011 <br /> COPYRIGHTO 2011 Steel Tank Institute <br />