My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2800 - Aboveground Petroleum Storage Program
>
PR0516703
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:14:30 PM
Creation date
7/31/2019 10:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516703
PE
2832
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Monthly Inspection Checklist <br /> General ins 3ection information: Retain Until Dale: (36 monUs from inspection date) <br /> InsDedlon Date: <br /> �Z <br /> _1 <br /> PriorlrepecVon Data: Inspector Name:`J 1 ' <br /> Tanks Inspected(ID Ws): <br /> Inspection Guidance: Procedures' <br /> v For equipment not included in this Standard,follow the manufacturer recommended inspectioNtesting schedustructures end <br /> Y nment <br /> The periodic <br /> ASshaT Inspection is Inte <br /> be performed by anded n owner's inapectorhwho is feral IAar with the site and can tlST comfillon and it' 'ntify changes and davebping problemsdoes not require a Cartifled <br /> hrmim,or spill contain , <br /> v discharge to the environ pon discovery of water Invethe primary nt, repeoi then)quid fordregulatetl productsror otherr=taraineros and dispoor sed of it Propemove rllyor take other oomacdve action.Before <br /> p (•)designates an item in anon-conformanos status.This indicates that evaluation <br /> is required to gursesse problem. <br /> an to address <br /> s nenced in AST design,a Certified Inspector,or a tank <br /> entinte ri require evaluaffonby 9 Pe <br /> ➢ Non-conforming items" p,.dam to tank to 41 <br /> manufacturer who w➢1 determire the corrective action.Note the non-conformance and correspontling corrective action in the comment section <br /> v Raisin the completed checkgsfs for 36 months. <br /> (normal the event of emergency shr(arrow;)�ary inspection of these camponenta(s 4 red as soon s the equipment Is safely accesible after the ritical event. <br /> Item Task <br /> Status Comments <br /> 1.0 To nk Containment Yes N �Q <br /> 1.1 Containment Check for water, 1 - LUSS <br /> structure debris,cracks or fra <br /> haunt <br /> 1.2 Prima tank Checkfor water Y No <br /> 1.3 Containment Operable and on a Yep <br /> drain valves closed osrfmn Yes <br /> 1.4 Pathways and Clear and NIA <br /> entry gmesldoms <br /> o mole \\// <br /> Yl <br /> 2.0 Leak Detection Visible signs of Yes' �r1V1.\ CA <br /> 2.1 Tank <br /> leaks a Yeses <br /> 2.2 Secondary gable <br /> Containment into afrom <br /> t <br /> s secondary ND CI Cn�hnO'YY,' <br /> containment <br /> 2.3 Surrounding Visible S"of yes* \l <br /> feet w <br /> soil Visible signs of Yes' i r � <br /> 2.4 Interst'Ice WA <br /> lea 4 SEPTEMBER 2011 <br /> PST INSPECTION STANDARD <br /> COPYRIGHT@ 2011 Steel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.