Laserfiche WebLink
Inspection ChecklistIns <br /> STI SPOO1 Annual a <br /> General inspection Information_ <br /> M,Ician Dare: ����11 Retain Until Data: (35 months from nvpaul-n date) <br /> Prior lnspecbon Data: _ i inspector Name: <br /> Tahesimpaol (ID#s): <br /> Inspection Guidance: <br /> For equipment not Included in this Standard,Follow the manuiecturer recommended inspectiontesting schedules and procedures. <br /> D <br /> D The periodic AST Inspectlon E intended for monitoring the external AST condition and its containment structure.This visual Inspection does not require a Certified <br /> Inspector.It shall tce performed by an owner's Inspector who Is familiar with the site and can identify changes and developing problems. <br /> D Remove prompdy upnn discovery standing water or liquid in the primary tank,secondary containment am.,interstice,or spill container. Before discharge to the <br /> environment,inspect the liquid for regulated products or other contaminants and disposed of it propery. <br /> D In order b comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly test liquid level sensing devices to ensure proper <br /> oparetion(40 CFR 112.B�c)(8)(v)). <br /> (')designates an item In a nonwnfomrence status.This indiWlas that action is required to address a experienced <br /> D Non-conkrming items imoorfa ttot kor contelnmem integrity requireforniationby anengineer <br /> onding correev is ASTdesign,om entre lnapector,ora tank <br /> manufacturerwho will de�rtn(ne the corrective action.Note the non-conformance and corresponding conectrve action in the comment radion, <br /> Y Retain[he completed checklists for 36 months. <br /> Complete this checklist on an annul basis suppkmenblto the owner mouthy-performed inspection checklists. <br /> D Note:If aenange has Dccurred to the tank system or containent that may affect the SPCC Pian,the condition should be evaluated against the currant <br /> plan requirement by a Professional Engineer knowledgeablm <br /> a in SPCC development and implementation. <br /> Item Task Status Comments <br /> 1.0 Tank Contain am Yes' No <br /> 1.1 Containment Check for: <br /> structure • Holes or cracks in <br /> containment all ` L,b`e Cvftl-L�Gn <br /> or floor <br /> • Washout <br /> • Linerdegradation <br /> • Corrosion <br /> • Leakage <br /> • Paintfailum <br /> • Tanksetdi <br /> 2.0 Tank Foundation and Su orfs Y No <br /> 2.1 Foundation Setllament or T�Q tda � <br /> foundation washout? <br /> 2.2 Concrete pad Craddng or spa'angf Ves' N <br /> or ring wall <br /> A5T INSP5011O STANDARD 8 SEPTEMBER 2011 <br /> COPYRIGHT®2011 Steel Tank Institute <br />