Laserfiche WebLink
. . .. ......... <br /> c.Make sure fusible Ye No' N/A <br /> element s in place <br /> and correctly <br /> ositioned. <br /> d.Be sure lest ports Ye No' N/A <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> Connected to valve. <br /> 5.31ntersAtial Check condition of Y No' WA <br /> leak detaetion equipment,Including, <br /> equipment The window is <br /> dean and clear in <br /> sight leak gauges, <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a licable. <br /> 5A Spill a.If corrosion, Yes' No W <br /> containment damage,or wear has <br /> boxes on fill Compromised the <br /> pipe ability ofthe unit to <br /> perform spill <br /> Containment functions, <br /> re lace the unit. No WA <br /> It.inspect the <br /> connections to the <br /> AST for lightness,as <br /> well as the bolts, <br /> nuts,washers for <br /> Condition and replace <br /> if necessa . <br /> c.gain valves must Yes' N <br /> be operable and <br /> closed <br /> 5.5 Stramer a.Check that the Yes Ne 4F <br /> strainer is clean and in <br /> good condifion. - <br /> SEPTEMBER 1011 <br /> AST INSGT@t STAND ARD <br /> COPYRjGHHT®2011 Steel Tank Institute <br />