My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2800 - Aboveground Petroleum Storage Program
>
PR0516703
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:14:30 PM
Creation date
7/31/2019 10:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516703
PE
2832
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANKID <br /> SPECIFICATION: <br /> Design'. ❑11L ❑SWRI ❑Horimnlal ❑veNml ❑Rectaigulaz <br /> []API E]Other <br /> ❑ureoncvm <br /> Manufadurer: Contents: Cotutruction Dale: Last Re ldReoonsWclion Date:. <br /> Dimensions: Capsoldir Last CNw of Service Date: <br /> Construdion: ❑Bare Steel ❑Cethodloally Protected tCheck one:A.❑.CIeSAIO or B.[j impressed Current)Date lnStalled: <br /> Coiled Steel ❑Concrete ❑PlasUl iberglass ❑other <br /> ❑Doumle-Bolk m ❑Double Wall ❑tired Dsle Installed: <br /> Contemment ❑Earthen Dilm ❑Steel Dike ❑Conemte E]Synthetic liner ❑Other <br /> CRDM: ❑ Date Installed: Type: <br /> Release Prevention Bartier. ❑ Data InstallSO Tvpe: <br /> TANK ID <br /> SPECIFICATION: <br /> Design: ❑uL ❑SWRI ❑Horimnial ❑vertical ❑Rectangular <br /> ❑API <br /> ❑Unknown ❑Other <br /> Manufacturer Contents: Caretmc6an Date: last Re etdRbcbnsWction Date: <br /> Dimeresons, Cepa . Last Ch of SeNice.Dale! <br /> Construction: ❑Sere Steel ❑Cathorikelly Protected(Check one:A.❑anteeSgO or B.❑Impressed Current)nate installed <br /> ❑Coated Sled ❑Concrete ❑PlaslicJFlberglsS ❑Other <br /> ❑Dadgl, o bm ❑Double-WSH El Lined Dete InstalW:. <br /> containment: ❑Earthen Detre ❑:Steel Dike ❑Coocrele ❑Synbeegc liner ❑ONer <br /> CRDM: ❑ Date Installed: TYW <br /> Release PreveNion BSrde ❑ Da@Installed: Type: <br /> AST INSPECTION STANDARD 2 SEPTEMBER 2011 <br /> COPYRIGHT02011 Sfeel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.