Laserfiche WebLink
c.Make sure fusible No' NIA <br /> element is in place <br /> and correctly <br /> ositloned. <br /> d.Be sure last por4s Ye No' N/A <br /> are sealed with plug <br /> atter tasting is <br /> complete and no <br /> temporary test fortune <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of No' NIA <br /> leak detection Kulpment,including: <br /> equipment • The window is <br /> Gean and clear In <br /> sghtleak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button, if <br /> a liwble. <br /> 5.4 Spill a.If corrasion, Yes' No <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions, <br /> re lace the unit. <br /> b.Inspect the No NfA <br /> connections to the <br /> AST for lightness, as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> If necessary <br /> c.Drain valves must Yes' No <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the Yes No` ,MVA <br /> strainer is clean and in <br /> good co.diton. <br /> AST INSPEGTION STANDARD SEPTEMBER 2011 <br /> COPYRIGHT®2011 Steel Tank Institute <br />