Laserfiche WebLink
c Make sure fusible a Nd NIA <br /> element is in place <br /> and comody <br /> ositioned. <br /> d.Be sum test ports a No' NIA <br /> are sealed with plug <br /> atter testing is <br /> complete and no <br /> temporary fest fixture <br /> or component remains <br /> connected to valve. <br /> 5.31ntersfifial Check condifion of No` NIA <br /> leak detedlon equipment,including: <br /> equipment . The window is <br /> clean and clear in <br /> sightleak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a Insole. <br /> 5.4 Spill a.Ifcormslon, Yes' No <br /> conteinment damage,or wear has <br /> boxes on fill compromised the <br /> FIGe ability Ofthe unit to <br /> Part.=split <br /> containmerdfundions, <br /> replace the unit. <br /> b.Inspect the No NIA <br /> connections to the <br /> AST for fighmess,ss <br /> well as the bolts, <br /> nods,washers for <br /> condition and replace <br /> if necesaa . <br /> c.Drain valves must Yes' No <br /> be operable and <br /> dosed <br /> 5.5 Strainer a.Check'that the Yes No" <br /> strainer is clean and in <br /> ood condition. <br /> AST INSPECTIDN STANDARD SEPTEMBER 2011 <br /> COPYRIGHT®2011 Steel Tank Institute <br />