Tracy Material Recovery&Transfer Station SPCC Plan <br /> Table 3-1 <br /> Locations with Spill Potential <br /> Location of Volume and Predicted <br /> Potential Releases Predicted Flow Rate Flow Direction <br /> The AST located Assuming a rupture of the AST results in A tank leak would be contained <br /> outside the pump the loss of the entire contents,a total within the secondary containment <br /> house(50-gal volume of 50 gallons would be released. space between the internal and <br /> diesel) Assuming a release occurs during filling of external tanks.The tank is <br /> the AST,up to approximately ten gallons located outside the pump <br /> (T-10) would be released from hose residues building. <br /> before supplier and/or facility personnel The closest storm drain is outside <br /> would respond since someone is always <br /> present during filling. of the pump house and <br /> approximately 80 feet south of <br /> the pump house door. In the <br /> event of a release from the <br /> secondary containment,all <br /> contents of the AST would flow to <br /> the drain system to the retention <br /> basin. <br /> The AST located at Assuming a hose rupture release occurs A hose leak would be contained <br /> the MRF/TS for during operation of the baler,up to 25 within the building by the floor <br /> baler(1,500 gal) gallons could be released before response slab and by sorbent deployed in <br /> could be initiated by on-site personnel. response to the leak. <br /> (T-12) (This scenario assumes a leakage rate of If a rupture of the hydraulic <br /> 5 gpm and response time is estimated at 5 system occurred,the contents of <br /> minutes). the AST would flow to the north <br /> Assuming a rupture of the AST results in towards multiple inlets for the <br /> the loss of the entire contents,a total drain system and to the retention <br /> volume of 1,500 gallons would be basin. <br /> released. <br /> Oil piping within the Assuming a release occurs from small A piping leak would be contained <br /> shop diameter oil piping between the product within the bay by the shop floor <br /> tanks and the truck bay,up to 5 gallons slab and by sorbent deployed in <br /> might be released before response could response to the leak. <br /> be initiated by on-site personnel. <br /> October 2019 3-4 <br />