SPCC PLAN REGULATORY CROSS-REFERENCE TABLE <br /> Section in <br /> 40 CFR this SPCC <br /> Section Description Plan <br /> 112.8(d)Facility Transfer Operations,Pumping,and Facility Process(onshore facilities,except oil <br /> production) <br /> 112.8(d)(1) Provide buried piping that is installed or replaced on or after August 16, N/A <br /> 2002,with a protective wrapping and coating.You must also cathodically <br /> protect such buried piping installations or otherwise satisfy the corrosion <br /> protection standards for piping in part 280 of this chapter or a State <br /> program approved under part 281 of this chapter. If a section of buried <br /> line is exposed for any reason,you must carefully inspect it for <br /> deterioration.If you find corrosion damage,you must undertake additional <br /> examination and corrective action as indicated by the magnitude of the <br /> damage. <br /> 112.8(d)(2) Cap or blank-flange the terminal connection at the transfer point and mark N/A <br /> it as to origin when piping is not in service or is in standby service for an <br /> extended time. <br /> 112.8(d)(3) Properly design pipe supports to minimize abrasion and corrosion and 3.2 <br /> allow for expansion and contraction. <br /> 112.8(d)(4) Regularly inspect all aboveground valves,piping,and appurtenances. 4.1 <br /> During the inspection you must assess the general condition of items, <br /> such as flange joints,expansion joints,valve glands and bodies,catch <br /> pans,pipeline supports,locking of valves,and metal surfaces.You must <br /> also conduct integrity and leak testing of buried piping at the time of <br /> installation,modification,construction,relocation,or replacement. <br /> 112.8(d)(5) Warn all vehicles entering the facility to be sure that no vehicle will 4.5 <br /> endanger aboveground piping or other oil transfer operations. <br /> Appendix 3 to Appendix C to Part 112—Substantial Harm Criteria 1.2 <br /> Part 112 Appendix 2 <br /> This SPCC Plan Cross-Reference and Completeness Checklist was completed for non- <br /> transportation related facilities.The following SPCC regulations do not apply to this facility: <br /> 40 CFR § 112.9 Spill Prevention, Control, and Countermeasure Plan requirements for <br /> onshore oil production facilities; <br /> 40 CFR § 112.10 Spill Prevention, Control, and Countermeasure Plan requirements for <br /> onshore oil drilling and workover facilities; <br /> • 40 CFR § 112.11 Spill Prevention, Control, and Countermeasure Plan requirements for <br /> offshore oil drilling,production,or workover facilities;and, <br />