My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2800 - Aboveground Petroleum Storage Program
>
PR0515652
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 10:57:16 AM
Creation date
7/31/2019 1:22:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515652
PE
2832
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Plan Review and Amendment Log <br /> Review I have completed review and evaluation of the SPCC Plan for Tracy Material Reviewer Signature <br /> Number Recovery&Transfer Station on the indicated date and will/will not amend the <br /> Plan as a result. <br /> (Indicate appropriate column) <br /> Date Will Will Not <br /> 1 July 1,2011 X <br /> 2 May 1,2016 X <br /> 3 July 26,2019 X <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> This SPCC Plan must be amended within six months after any change in facility design, construction, operation or maintenance,which materially <br /> increases the facility's potential for the discharge of oil. <br /> This SPCC Plan must be reviewed and evaluated by management at least once every five years. <br /> Technical amendments are not effective unless certified by a Professional Engineer in accordance with 40 CFR 112.3(d). <br /> Minor revisions such as changes in personnel or telephone numbers should be noted in the SPCC Plan but do not require P.E.certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.