Laserfiche WebLink
Are all valves free of leaks,corrosion and other <br /> damage?Follow manufacturers'instructions for <br /> regular maintenance of these items.Check the <br /> following and verify(as applicable): <br /> ❑Anti-siphon valve ❑Yes ❑No 1-1 N/A <br /> ❑Check valve <br /> ❑Gate valve ❑Yes ❑No 1-1 N/A <br /> 18 ❑Pressure regulator valve ❑Yes ❑No 1-1 N/A <br /> ❑Expansion relief valve <br /> ❑Solenoid valve ❑Yes ❑No ❑N/A <br /> ❑Fire valve ❑Yes ❑No ❑N/A <br /> ❑Shear valve <br /> ❑Yes ❑No ❑N/A <br /> ❑Yes ❑No 1-1 N/A <br /> 17 Are strainers and filters clean and in good condition? ❑Yes ❑NO ❑N/A <br /> Insulated Tanks <br /> Free of missing insulation? ❑Yes ❑NO El N/A <br /> 18 Insulation free of visible signs of damage? <br /> Insulation adequately protected from water intrusion? <br /> 19 Insulation free of noticeable areas of moisture? ❑Yes ❑No ❑N/A <br /> 20 Insulation free of mold? <br /> ❑Yes ONO El N/A <br /> 21 Free of visible signs of coating failure? <br /> ❑Yes ONO El N/A <br /> Tank/Piping Release Detection <br /> 22 Is inventory control being performed and documented <br /> if required? ❑Yes ONO El N/A <br /> 23 Is release detection being performed and documented <br /> if required? ❑Yes ❑No El N/A <br /> Other Equipment <br /> 24 Are electrical wiring and boxes in good condition? ❑yes ❑No ❑N/A <br /> Has the cathodic protection system on <br /> An Ua2l h t%h Wit been tested as required by ❑Yes� 3 NO ON� <br /> gning engineer? age f <br />