Laserfiche WebLink
SPCC PLAN REGULATORY CROSS-REFERENCE TABLE <br /> Section in <br /> 40 CFR this SPCC <br /> Section Description Plan <br /> Subpart A—Applicability, Definitions, and General Requirements For All Facilities and All Types of Oils <br /> § 112.1 through 112.7 <br /> 112.1 General applicability establishing procedures, methods and equipment Entire Plan <br /> and other requirements for equipment to prevent the discharge of oil from <br /> non-transportation-related onshore and offshore facilities into or upon the <br /> navigable waters of the US or adjoining shorelines. <br /> 112.3(a) - (c) Requirements for preparation and implementation of SPCC Plans in 1.0 <br /> accordance with 40 CFR 112.7 and any other applicable section of 40 <br /> CFR 112. <br /> 112.3(d) Obtain Professional Engineer's review and certification. P.E. Certifies the 1.4 <br /> SPCC Plan was prepared in accordance with good engineering practice, <br /> including consideration of applicable industry standards, and with the <br /> requirements of the SPCC rule. <br /> 112.3(e) Maintain copy of SPCC Plan on-site if facility is normally attended at least 1.1 <br /> 4 hours per day; otherwise, maintain it at nearest field office. Also, make <br /> Plan available to USEPA RA or other local agency inspector for on-site <br /> review during normal working hours. <br /> 112.4(a) - (c) When discharge >1,000 gallons of oil in a single discharge as described in 5.3.2 <br /> 40 CFR 112.1(b), or(2)discharge more than 42 U.S. gallons of oil as <br /> described in 40 CFR 112.1(b), in each of two discharges within any 12- <br /> month period, submit, within 60 days, a report to regional EPA and to the <br /> state agency in charge of oil pollution control activities, State Water <br /> Board. <br /> 112.4(d) & (e) If requested by the USEPA RA, respond to request for an amendment 5.3.2 <br /> within 30 days of the first notice and amend SPCC Plan within 30 days of <br /> USEPA's notification following facility's response. <br /> 112.5(a) Amend SPCC Plan, within 6 months, whenever there is change in facility 1.3 <br /> design, construction, operation or maintenance, which materially affects <br /> facility's potential for discharge. <br /> 112.5(b) Perform a review and evaluation of SPCC Plan at least once every five 1.3 <br /> years. The owner/operator must document completion of the review and <br /> evaluation, and must sign a statement as to whether he will amend the <br /> SPCC Plan. The following will suffice: "I have completed review and <br /> evaluation of the SPCC Plan for(name of facility) on (date), and will (will <br /> not) amend the Plan as a result." <br /> 112.5(c) Obtain Professional Engineer's certification for any technical amendments 1.3 <br /> in accordance with 112.3(d). <br />