Laserfiche WebLink
Mr. and Mrs. Kevin Cheam Project 0805 - 117 . 01 <br /> October 24, 1994 <br /> Page 2 <br /> EMCON will contact you to coordinate drilling operations to determine which day of the week is most <br /> convenient. Our tentative schedule for the construction of the monitoring well is December 1994. <br /> Upon receipt of your authorization, we will schedule a date for our work and we will inform you of <br /> that date. <br /> An EMCON technician would periodically need to gain access to the well for data acquisition and <br /> maintenance for approximately 1 year, or as required by San Joaquin County. After the well is no <br /> longer needed, the well will be properly destroyed by drilling it out with a 10- to 12-inch-diameter <br /> auger and backfilling the borehole with neat cement. The ground surface will then be restored to <br /> resemble the surrounding ground material. <br /> We appreciate your cooperation in this matter. Please sign and return both copies to our office. We will <br /> forward both copies to ARCO. ARCO will then sign both copies and will return one copy to you for <br /> your files. Upon your authorization to access your property, we will arrange a time to perform the <br /> work and appraise you of the schedule. <br /> Please call Jay R. Johnson at (916) 928-3300 if you have any questions about the work. <br /> Sincerely, <br /> EMCON Associates <br /> Claudio Avila ' Jay RJohnson <br /> Project Geologist Senior Project Supervisor <br /> Attachments: Figure 1 Generalized Site Plan <br /> Figure 2 Schematic Well Design <br /> ARCO Products Company License Agreement (two copies) <br /> cc: Mike hifa na, San Joaquin County Public Health Services <br /> 5AC/PJM805V08051170. 1 BW94/ma :3 <br />