My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. and Mrs. Kevin Cheam Project 0805 - 117 . 01 <br /> October 24, 1994 <br /> Page 2 <br /> EMCON will contact you to coordinate drilling operations to determine which day of the week is most <br /> convenient. Our tentative schedule for the construction of the monitoring well is December 1994. <br /> Upon receipt of your authorization, we will schedule a date for our work and we will inform you of <br /> that date. <br /> An EMCON technician would periodically need to gain access to the well for data acquisition and <br /> maintenance for approximately 1 year, or as required by San Joaquin County. After the well is no <br /> longer needed, the well will be properly destroyed by drilling it out with a 10- to 12-inch-diameter <br /> auger and backfilling the borehole with neat cement. The ground surface will then be restored to <br /> resemble the surrounding ground material. <br /> We appreciate your cooperation in this matter. Please sign and return both copies to our office. We will <br /> forward both copies to ARCO. ARCO will then sign both copies and will return one copy to you for <br /> your files. Upon your authorization to access your property, we will arrange a time to perform the <br /> work and appraise you of the schedule. <br /> Please call Jay R. Johnson at (916) 928-3300 if you have any questions about the work. <br /> Sincerely, <br /> EMCON Associates <br /> Claudio Avila ' Jay RJohnson <br /> Project Geologist Senior Project Supervisor <br /> Attachments: Figure 1 Generalized Site Plan <br /> Figure 2 Schematic Well Design <br /> ARCO Products Company License Agreement (two copies) <br /> cc: Mike hifa na, San Joaquin County Public Health Services <br /> 5AC/PJM805V08051170. 1 BW94/ma :3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.