My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Company <br /> 2000 Alameda de las Pulca = <br /> Mailing Address : Box 58n ���- TyC�9t fj � t�o <br /> AMW <br /> San Mateo, California 95= 02 it <br /> Telephone 415 571 2400 P� <br /> ENVIRGPd ;•dE^ lGa'� � EALTH <br /> September 2, 1994 <br /> PERMIT / SERVICES <br /> Diane Henson <br /> Public Health Services <br /> San Joaquin County <br /> P . 0. Box 2009 <br /> Stockton, California 95201 <br /> Re: Meeting Minutes on August 8, 1994 Between San Joaquin County Environmental Health, <br /> Central Valley Regional Water Quality Control Board and ARCO <br /> Dear Ms, Henson: <br /> Thank you for your time and efforts in the last meeting with the County. ARCO has received <br /> your letter dated August 29, 1994 and has prepared additional comments that summarizes what <br /> was stated during discussions of each site. Also, this will confirm our next meeting date at <br /> Tuesday, November 14, 1994. We all look forward to this time. <br /> Present at meeting : <br /> Beth Thayer, CVRWQCB <br /> Diane Hinson, County <br /> Margaret Lagorio, County <br /> Mike Infurna, County <br /> Mary Meays, County <br /> Linda Turkatte, County <br /> Harlin Knoll, County <br /> Chris Winsor, ARCO <br /> Kyle Christie, ARCO <br /> Chuck Carmel , ARCO <br /> Jay Lucas, Brown and Caldwell <br /> Matt Turner, Brown and Caldwell <br /> Steve Misner, Brown and Caldwell <br /> Jay Johnson , EMCON <br /> General Comments : <br /> Mike Infuma: <br /> He requests that quarterly monitoring reports be submitted prior to subsequent sampling events <br /> so that the county can evaluate the data from the previous quarter. He also stated that there <br /> were problems with Groundwater Technology sampling crews ability to schedule meeting times <br /> and actually miss the County for scheduled sampling events. <br /> This was addressed by Kyle Christie and by reorganizing the quarterly sampling program would <br /> probably impact other counties schedules. The main point was that samples are being taken on <br /> a quarterly basis and that this schedule should be adhered to . The reports will be drafted and <br /> finalized as quickly as possible. Kyle indicated that he would address Groundwater Technology <br /> for the counties concerns so they will meet when they are scheduled to. <br /> ARCO P,adnrtsc - - APPC- 7025-D <br /> onto r � � o�.�s,an _ _ _ ,,,,Qiec n v (9-88) <br />
The URL can be used to link to this page
Your browser does not support the video tag.