My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ARCO Meeting Minutes <br /> August a , 1994 <br /> Page 5 <br /> ARCO stated that installation and operation of a vapor extraction system will begin once an <br /> abatement unit is available. ARCO said that they intend to utilize the next available unit for <br /> remediation of ARCO SS No. 760 which appears to have a higher degree of hydrocarbon impact. <br /> Mary disagreed and requested ARCO to evaluate the two sites by calculating a mass balance <br /> and make a determination based on the total amount of hydrocarbons in the soil. ARCO said <br /> they would provide this information of her in the near future. <br /> ARCO 2133, Stockton (Mary Meays) <br /> Mary indicate that installation of the soil remediation system has been delayed too long. She <br /> states that the extent of the groundwater and soil contamination to the south and west <br /> has not been defined. She stated that her request for the remedial system was to be installed of the site <br /> to <br /> by <br /> July 20 , 1994. Kyle explained that the owner of the site is a new franchisee and if ARCO <br /> environmental closed the station down for two weeks that would be required to install the system, <br /> then this new owner would loose a significant portion of his annual revenue because this is his <br /> peak season for sales. Therefore, the system construction will commence the week after Labor <br /> Day, The County agreed with this. Chuck explained that all permits are in place and the contract <br /> for building the system has been awarded. <br /> ARCO would like to state that they have been very diligent with design and implementation of the <br /> vapor and sparge remedial system. There are many elements to securing information that <br /> ultimately have major influence and factors for this kind of remedial approach. We would like to <br /> add that we are much further along then other responsible parties in the area. <br /> Mary says that ARCO has not been diligent as she would like in obtaining permission to drill in <br /> Cal-Trans right of way between the ARCO site and the 1-5 off ramp. Steve Misner explained that <br /> BC requested a letter of refusal on a number of times from Mr. Galliano of CakTrans but they <br /> have not submitted one. Mary says we should write at least one more letter to Cal-Trans <br /> requesting permission. Chuck says a letter will be prepared. Diane Hinson states that it may be <br /> possible to drill a couple of hydropunch samples in this area, so that we will be out in the right of <br /> way one time. Diane will give Steve Misner the name of the contact she has at Cal-trans. <br /> Group discussed problems obtaining off site access to the condominiums to the south of the site. <br /> Misner states that BC has tried to reach the owner of the parking area with no success. Kyle <br /> states that BC will write a letter to this person by the end of August. <br /> Mary says she is going to require samples from below the groundwater table during the next <br /> phase of drilling. She says the data can be used to calculate the mass balance of hydrocarbons <br /> in the soil. There was discussion concerning the use of this data and whether or not this data <br /> would really be accurate or even be detected. ARCO will agree to collect a few selected samples <br /> to show a good faith effort to further analyze whether or not this additional expense is <br /> appropriate. <br /> 3 <br /> Mary stated that during the initial release at this site the hydrocarbon vapors blew the city street <br /> lights out. <br /> 7 <br /> i <br /> ARCO 6080, Lathrop (Linda Turkatte) <br /> Annual sampling should be conducted at this site. The sampling has been scheduled in August. <br /> Linda suggest that the County split a sample with GTI when they are out there sampling in <br /> August and ARCO agrees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.