My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products ComFany <br />" 2000 Alameda de las Pulcas <br /> Aid <br /> Mailing Address: Box 5811 <br /> T ow <br /> San Mateo, California 94402 - + L i s ALTli <br /> r- <br /> Telephone 415 571 2400 - - <br /> ei ' .. - FI � 2 : 35 <br /> July 29 , 1994 <br /> Ms. Donna Heran <br /> San Joaquin Co. Public Health Services <br /> Environmental Health Division <br /> P . O . Box 388 <br /> Stockton, CA 95201 -0388 <br /> Re: ARCO meeting with PHS/EHD staff <br /> Dear Ms . Heran: <br /> ARCO will gladly meet with the PHS/EHD staff on August 9 1994 at 10 : 00 AM <br /> 9 Y 9 <br /> as requested in your July 14, 1994 letter. However, I was disturbed to read that <br /> the PHS/EHD staff believes that the commitments which ARCO made in March <br /> of 1993 have not been met and that ARCO has failed to comply with our mutual <br /> agreements . This is simply not the case and I believe that you have been <br /> misinformed by your staff. This letter reviews action items which were agreed <br /> upon at the March 1993 meeting and work which ARCO has performed to <br /> address the action items . <br /> Resna, on behalf of ARCO , mailed on April 22, 1993 a summary of the ARCO - <br /> PHS/EHD meeting to Ms. Laurie Cotulla of the PHS/EHD and Ms. Beth Thayer <br /> of the RWQCB . On April 29 , 1993 the PHS/EHD responded with a letter to <br /> ARCO which also summarized the meeting and presented action items which <br /> were to be performed. Site specific discussion of the action items follow. <br /> Fac. #2130, 7906 N. EI Dorado St., Stockton <br /> PHS/EHD recommended that additional offsite wells be installed to the <br /> south and that the results of the air sparging tests be submitted. <br /> In early November of 1993 , after access permission had finally been <br /> granted by Cal Trans, ARCO was able to install 2 wells south of the facility. <br /> Three sampling events have been performed on these wells since they were <br /> installed. ARCO has issued the following reports on this site since the March '93 <br /> meeting : a) quarterly status reports dated 4/14/93 , 6/3/93 , 10/14/932 & <br /> 2/16/94 , <br /> b) Air Sparge Pilot Test report dated 6/21 /93, <br /> c) Limited Subsurface Investigation report dated 6/30/93 , <br /> d ) Underground Storage Tank Removal report dated 2/16/94 <br /> e) Problem Assessment report dated 6/6/94 <br /> f) Final Remediation Plan for Soil & Groundwater dated 6/7/94. <br /> APPC-7025-D <br /> ARCO Products c mpa r is o Division _ - immFmnfieldc p'p=dy (9-88) <br />
The URL can be used to link to this page
Your browser does not support the video tag.