My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fac. #2076, 800 East Kettleman Lane, Lodi <br /> PHS/EHD requested submittal of the Problem Assessment Report. <br /> Remediation will proceed when the contamination has been defined and <br /> equipment becomes available. The PHS/EHD indicated that this site is a low <br /> priority. <br /> ARCO issued the Problem Assessment Report on 4/15/93 . Quarterly <br /> status reports dated 4/27/93 , 7/2/93, 11 /3/93 & 3/24/94 have also been issued <br /> and document that groundwater is not impacted by hydrocarbons. <br /> Fac. #434, 501 Kettleman Lane, Lodi <br /> PHS/EHD requested that vapor extraction and quarterly monitoring <br /> continue. <br /> ARCO has submitted quarterly status reports over the past year. ARCO <br /> also submitted a work plan for clean-up confirmation borings to the PHS/EHD on <br /> 3/22/94. Groundwater beneath and adjacent to the site has been nondetect to <br /> near nondetect since February of 1993. <br /> ARCO recently received approval from the San Joaquin Valley Air <br /> Pollution Control District to use a biofilter to remediate the low concentrations of <br /> hydrocarbons being emitted from the operating vapor extraction system. The air <br /> emission treatment unit currently at the site will be moved to ARCO facility <br /> #2093 in Tracy in the near future. <br /> Fac. #6100, 25775 Patterson Pass Road, Tracy <br /> PHS/EHD requested an investigation of the depth at which groundwater <br /> enters the water supply well . Off-site assessment is to continue. <br /> ARCO addressed the depth to groundwater at the site in a letter report to <br /> the PHS/EHD dated 11 /4/93. ARCO has sent an access agreement to Mr. <br /> Robert Vieira on 6/15/93 and again on 4/4/94 for the purpose of drilling on his <br /> property in order to further define the extent of soil contamination . Mr. Vieira has <br /> not replied to ARCO . <br /> Fac. #2093, N . Tracy Blvd., Tracy <br /> ARCO was to install remediation piping and begin vapor extraction . Since <br /> the 3/93 meeting ARCO has performed the following : <br /> a) submitted quarterly status reports dated 6/14/93, 11 /8/937 & <br /> 3/9/94. <br /> b) submitted a Final Remediation Plan dated 5/14/93 <br /> c) submitted a Work Plan for Soil Excavation and Sampling dated <br /> 5/14/93 . <br /> d) submitted a limited Subsurface Investigation report dated 7/1 /93 <br /> e) issued the Underground Storage Tank Removal & Soil Sampling <br /> report dated 10/14/93 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.