My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFAWuAM <br /> tAWssVArE% <br /> Working To Restore Nature <br /> San Joaquin/ARCO Meeting Minutes, March 30, 1993 <br /> o SJ stated that they do not have any records of failed tank tests or releases <br /> which would allow them to require site assessments at the adjacent properties. <br /> ARCO would have to initially assess in these areas to bring in other PRPs. <br /> o RESNA stated that authorization from Caltrans would be required to drill in <br /> Charter Way. City access could be obtained to drill in Lincoln Street. <br /> ARCO SS No. 6020, West Yosemite Ave., Manteca <br /> o RESNA informed SJ that a Preliminary Investigation and Evaluation Report <br /> has been prepared and will be submitted shortly following ARCO's review. <br /> RESNA summarized the results of the recent investigation, stating that <br /> hydrocarbons were not detected in the soil borings or ground-water samples <br /> collected from the newly installed monitoring wells. <br /> o SJ requested that the ground water be monitored for one full year. RESNA <br /> informed SJ that ground-water elevations are being monitored on a monthly <br /> basis to evaluate changes in the flow direction. Monthly monitoring will <br /> continue until a trend is established. <br /> o RESNA informed SJ that only minor amounts of hydrocarbons at low <br /> concentrations (3 .5 ppm TPHg) have been identified in soil in the vicinity of <br /> the underground storage tanks. SJ stated that the soil affected by <br /> hydrocarbons near the USTs could likely be removed when the tanks are <br /> replaced in the future. <br /> o SJ and ARCO indicated that this site is of low priority. <br /> ARCO SS No. 760, South Cherokee Lane, Lodi <br /> o Linda Turkatte referenced the recently submitted work plan for an additional <br /> investigation involving the installation of three vapor-extraction wells. She <br /> also referenced a letter addressed to ARCO dated July 19, 1992, in which she <br /> requested that the groundwater be assessed beneath the site and listed areas <br /> of concern onsite which she felt warranted further investigation. SJ is <br /> requiring assessment of ground water beneath the site based on hydrocarbons <br /> detected at 36 and 46 feet below surface grade (bsg) and an historical ground- <br /> water elevation of 40 ft bsg. Areas of concern onsite included the area near <br /> the former tank cavity were borings 13-5 and B-20 are located ; Linda stating <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.