My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:47:58 AM
Creation date
8/1/2019 10:10:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N PUBLIC HEALTH SERVICES <br /> LLo0.4uiN C <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D . , M.P.H. , Health Officer . .. P ., <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> MEMORANDUM <br /> Date : December 14, 1999 PY To : Jack Coffelt 0 <br /> Elite IV <br /> From: Michael Kith, Sr. REHS 1ffll� <br /> San Joaquin County <br /> Environmental Health Division <br /> Re : Arco #2130, 7906 N. El Dorado Ave., Stockton, Ca. <br /> Your application for tank retrofit permit is approved with the following conditions : <br /> 1 . Contact Fire Department for permit. <br /> 2 . Contact me for the following inspections : <br /> a. Primary piping test. <br /> b. Secondary piping test. <br /> c. Piping slopes to collection sump . <br /> d. 24 hours lake test on the 2 sumps. <br /> e. Corrosion protection. <br /> f. Final inspection, including performance test for continuous monitoring system <br /> and line leak detector if they are disturbed, tank access ports brought to grade and <br /> watertight, tank and line integrity test with hard copy submitted to EHD, new <br /> monitoring and response plan, and State form C submitted to EHD . <br /> 3 . All appointments must be scheduled at least 48 hours in advance. <br /> 4. Tank and piping shall be monitored for the duration of this construction. <br /> 5 . If the monitoring well or casing for future well is disturbed during this construction <br /> contact Michael Infurna of Site Mitigation Unit for directives prior to proceeding . <br /> 6. This permit expires on 3/14/2000 . <br /> If you shall have any questions please contact me at 209468-3444. <br /> i <br /> i <br /> i' <br /> I <br /> i <br /> i <br />'r <br />'i <br /> i <br /> i <br /> L A Division of San Joaquin County Health Care services <br />
The URL can be used to link to this page
Your browser does not support the video tag.