My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
FIELD DOCUMENTS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:23:32 AM
Creation date
8/1/2019 10:12:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 / 02 / 02 WED 15 : 29 FAX 916 6702900 URS Q010 <br /> LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 0805. 114.02 <br /> PROJECT NAME ARCO Products Company Service Station No. 2130 BORING NO. B28/VW12 <br /> BY D. Foley DATE 8/11/95 PAGE 4 OF 4 <br /> RECOVERY 'IO PENE7RA- <br /> SURFACE EUV. ~ 15 ft. <br /> TION J W LITHO- <br /> ' ¢ L aJJ GRAPHIC <br /> ( ft/ ft ) E COLUMN DESCRIPTION WELL <br /> O (bless/ (UJ '{ ¢ DETAIL <br /> 1 . 0/ l .5 <br /> SELT (Ml ) continued <br /> 40 <br /> i <br /> SANDY SILT (ML), brown ( 10YR, 5/3 ) ; 65 % low <br /> 1 . 0! 1 . 5 plasticity fines; 35% fine-grained sand : trace <br /> iron-oxide staining; very stiff; wet; slight to <br /> 21 moderate hydrocarbon odor <br /> 65 <br /> BORING TERMINATED AT 65.3 FEEL <br /> i <br /> i <br /> 70 <br /> i <br /> I <br /> I <br /> 75 <br /> i <br /> i <br /> I <br /> I <br /> 80 - <br /> R !MARKS <br /> 0REMARKS <br /> Boring drilled using 10-inch diameter continuous-flight. hollow-stem auger drilling equipment and sampled with a <br /> modified Cald rnia spilt-spoon sampler. Boring converted to a 4-inch diameter vapor extraction well. Su well <br /> Details sheet for well construction infortnatiou. <br /> E ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.