My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009966
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:31:43 PM
Creation date
8/1/2019 10:59:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009966
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� MONITORING WELL PURGING PROTOCOL <br /> 0 MEASURE AND RECORD DEPTH TO WATER AND <br /> `� WELL TOTAL DEPTH <br /> Ovv i <br /> CHECK FOR FLOATING PRODUCT <br /> YES NO <br /> MEASURE AND DOCUMENT CALCULATE PURGE VOLUME BY <br /> FLOATING PRODUCT TI-IICKNESS USING THE FOLLOWING EQUATION <br /> DO NOT SAMPLE WELL FOR P = x rzh x 7 48 x 3 <br /> DISSOLVED CONSTITUENTS where <br /> P= calculated purge volume(gallons) <br /> 7t=314 <br /> r=radius of well casing in feet <br /> h= height of water column in feet <br /> EVACUATE WATER FROM WELL EQUAL TO <br /> WELL EVACUATED TO PRACTICAL LIMITS THE CALCULATED PURGE VOLUME WHILE <br /> OF DRYNESS BEFORE REMOVING MONITORING GROUNDWATER <br /> CALCULATED PURGE VOLUME STABILIZATION INDICATOR PARAMETERS <br /> (pH, CONDUCTIVITY,TEMPERATURE)AT <br /> INTERVALS OF ONE CASING VOLUME <br /> NO YES <br /> FINAL TWO SETS OF GROUNDWATER <br /> STABILIZATION INDICATOR PARAMETER <br /> MEASUREMENTS MEET THE FOLLOWING <br /> CRITERIA WELL RECHARGES TO A LEVEL <br /> pH = ±0 1 pH units SUFFICIENT FOR SAMPLE <br /> COND =* 10 % COLLECTION WITHIN 24 HOURS <br /> TEMP = ± 1 0 °F OF EVACUATION TO DRYNESS <br /> YES NO YES NO <br /> WELL PURGING CONTINUE PURGING,EVACUATE FIELD TEST FIRST RECORD WELL <br /> CRITERIA MET, ADDITIONAL CASING VOLUME RECHARGE WATER FOR AS DRY FOR <br /> PROCEED TO OF WATER, MONITORING INDICATOR PARAMETERS, PURPOSES OF <br /> WELL SAMPLING INDICAI OR PARAMETERS FOR THEN PROCEED TO WELL SAMPLING <br /> STABILITY SAMPLING <br /> FIGURE <br /> EMCON MONITORING WELL PURGING PROTOCOL A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.