Laserfiche WebLink
ARCO/BP WELL MONITORING DATA SHEET <br /> 3TS #: 050327-BCI Station# 2130 <br /> Sampler: ar B Sumrnersett Date: Z- Z 7- c 5�- <br /> Well I.D.: V w _5 Well Diameter: 2 3 6 8 <br /> Total Well Depth: rJ d � j Depth to Water: q Z,o <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: 4MGrade D.O. Meter (if req'd): HACH <br /> 1" 0.04 4" 0.65 <br /> 2" 0.16 6" 1.47 SOY, I ) <br /> 3" 0.37 Otho radium•0.163 ��''"" <br /> Purge Method: Bailer Sampling Method: Bailer <br /> Disposable Bailer 4sposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other: <br /> Extraction Pump <br /> Other: <br /> Top of Screen: &5= If well is listed as a no-purge,confirm that water level is below the tap <br /> of screen. Otherwise,the well must be purged. <br /> t i0 X 3 – 16 Gals. <br /> L-1 Case Volume(Gals.) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (mS or ) Gals.Removed Observations <br /> W41 <br /> " -4-- <br /> d- <br /> �1[� <br /> Did well dewater? No Gallons actually evacuated: I-Z <br /> Sampling Time: 041 j Sampling Date: Z? -O57- <br /> Sample 1.D.: VW --rj Laboratory: Sequoia <br /> Analyzed for: GRO B?RX Ethanol Oxygenates(S) 1,2-acn Other: <br /> �,.. D.O. (if req'd): Pre-purge: (0—st- L i mg/ <br /> t <br /> O.R.P. (if reqd): Pre purge: mV Post-purge: mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />