My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> ATC Associates Inc. <br /> Quality A5surance/Quality Control Plan <br /> Revised March 1998 <br /> I <br /> i <br /> The chain-of-custody record will contain the following information: <br /> ✓ site name <br /> ✓ signature of collector <br /> ✓ date and time of collection <br /> ✓ sample identification number(s) <br /> ✓ number of containers in sample set <br /> ✓ description of sample and container(s) <br /> ✓ name and signature of persons, and the companies or agencies they represent, <br /> who are involved in the chain of possession <br /> ✓ inclusive dates and times of possession <br /> ✓ requested analysis for each sample <br /> 5.3 Delivery of Samples to Laboratory <br /> .Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to <br /> approximately 4°C for shipping. Shipping containers will be sealed with security tape to assure <br /> sample integrity during shipping. Delivered samples will be accompanied by a chain-of-custody <br /> record. The laboratory shall note on the chain-of-custody that samples were properly <br /> preserved and security tape was intact upon arrival. <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be decontaminated prior to use. All equipment used <br /> for collection of more than one sample, such as bailers and spoons, will be decontaminated between <br /> each use to prevent cross contamination between samples. Drilling equipment will be decontaminated <br /> prior to commencing drilling at each hole. Well construction materials will be cleaned as necessary, <br /> prior to installation. <br /> W.\Admin\Shells\QAQC-98.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.