My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ENTERPRISE
>
355
>
3500 - Local Oversight Program
>
PR0544728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 5:22:12 PM
Creation date
8/1/2019 4:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544728
PE
3528
FACILITY_ID
FA0003802
FACILITY_NAME
ACCURATE DELIVERY SYSTEMS
STREET_NUMBER
355
STREET_NAME
ENTERPRISE
STREET_TYPE
PL
City
TRACY
Zip
95304
APN
21221008
CURRENT_STATUS
02
SITE_LOCATION
355 ENTERPRISE PL
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/11/2901 09:47 557A078909 MONTYXWARRE""N54S)gO PAGE 01 <br /> State Water Resources Control Board <br /> Division of Ckxa W*W Prnglrams <br /> 1001 t SYoat•&ff& ftW'am"is, 95814 <br /> Wlaa m rt Rick" P.O.Bou 944212•Swnsmft,Califamia•94244-2120 <br /> &CM- v, (416)341-5681 s FAX(916)341-58% s www.swr0x. Vv/cwph*nwhis of Gray Davis <br /> Ex"awammi Gorrtrnor <br /> I'mhW— Thr rm W elm oV fgcftW orma it r t ZwA"Cwh Wjwx x*W ra jW 0*==fw&OVM Ao ftl*"~V wnuu pWX <br /> For a Iia of AwP&wa )m ca rWke A w W 4a tut yeoaWr owv eeaw,ane our wiakw ar www.rwre6 mVV. <br /> JUL 3' 1001 <br /> $nterpri�e Investments <br /> Monty Warier= <br /> 105.2 Amelia Dr <br /> Long Beach,CA 90807 <br /> L UNDERGROUND STORAGE TANK CLEANUP FUND(FUND),NOTICE OF ELIG)<AIL TY <br /> DETERMINATION: CLAIM NUMBER 016575;FOR S)i T ADDRESS, 355 ENTI~I MSE,TRACY <br /> Your claim has been accepted for placement on the Priority List in priority Class 'rC"with a deductible <br /> of 55,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> COmDllancg„$ rte' w- Staff rcvicwrs,verifies.and processes claims based on the priority and rank within <br /> a priority class. After the Ekwd adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority'Class and rank are reached- At that time,staff will conduct an Pattensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Hoard. During this Compliance <br /> Review,staff may request additional infotmuion needed to verify eligibility. Once the Compliance <br /> Review is completed,staff will determine if the claim is valid or must be rejected_ If the claim is valid,a . <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied wfth regulations governing site cleanup,your have not supplied necessary information <br /> or documentation,or your claim aWlmtian contains a material error-,the claim will be rejected. In s1 ch <br /> event,you will be issued a Notice of Intended Removal fimm the Priority List,informed of the basis fair <br /> the proposed removal of your claim,and provided an opportunity to correct the condition that is the basis <br /> ` for the proposed removal. Your claim will be barred from finrdrer participation in the Fund,if the claim <br /> Lapplication contains a material error resulting from fraud or imentimral or negligent misrepresentation. <br /> Record keening: Duttng your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and-payment transactions. If you we eventually issued a better of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices),(2)copies of canceled checim used to pay for work shown on the <br /> invoices, (3)copies of technical docummts(bids,narrative work description,reporks} and(4)evidence <br /> that the claimant paid for the work performed(not paid by snodu r party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of rt irrtbw semeut made by the <br /> Fund. It tr not ne9cassa7 to su"M Mew ateemne"art dela ;However,rA1ay wall d~be <br /> reyalrsd�lor w refwebasr� <br /> ` c2mliame Wiiffi CoffecfLft— In order to be reimbursed for your eligible costs of <br /> Lcleanup incurred after December 2, 1991,you must have compliadwith corrective action meats of <br /> Article 11,Chapter 16,Division 3,Title 23,California Code of Regulations. Article I I ca>timrized se <br /> corrective action psocass Tato pliaeas. In addition,Article 11 <br /> requires the responsible party submit an <br /> Cse J-aWr 0 a 0 Py W*CJ W As g my <br />
The URL can be used to link to this page
Your browser does not support the video tag.