Laserfiche WebLink
OPquIN <br />?•--•+F1''••a� SAN .IOAQUIN COUNTY <br />w <I ENVIRONMENTAL HEALTH DEPARTMENT <br />.l 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.org/ehd <br />P <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />— QV <br />Insection Date: <br />�q— <br />Facility Address: <br />1�' rn Vili <br />Service Request <br />r -S #: <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />..� C� <br />Manufacturer Training: <br />_(M) <br />r <br />- I -r I <br />OPIV <br />SERVICE <br />fD d5a rs& - 1il 0 �Q� <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />f SC' f64 alLi <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />Title: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />fD d5a rs& - 1il 0 �Q� <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />f SC' f64 alLi <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Received By <br />❑ Caldwell System ❑ Other <br />Title: <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for:. <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />NotePlease be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />us)4p <br />fD d5a rs& - 1il 0 �Q� <br />P ona <br />f SC' f64 alLi <br />DQ * cc) ns <br />THIS FACILITY IS SUBJECT TO REINSPECTIO AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EH ect <br />Received By <br />Title: <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />