My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2015 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2015 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 2:07:11 PM
Creation date
8/5/2019 10:44:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2016
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1399\PR0231435\2016 RETROFIT PLANS SR0074936 .PDF
QuestysFileName
2016 RETROFIT PLANS SR0074936
QuestysRecordDate
5/22/2017 9:16:03 PM
QuestysRecordID
3392977
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 4, 2016 <br />Hope Vargas o FIIE copy <br />LC Services <br />3887 N. Valentine Ave <br />Fresno, CA 93722 <br />Re: 7 -Eleven SR0073587 <br />1399 N Main Street, Manteca, CA <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to replace an underground 87 -octane product pipe between UDC 3/ and the 87 - <br />octane STP sump with OPW FlexWorks dual layer pipe (#C15A) on the underground storage tank (UST) <br />system at the above noted address. According to the permit requestor, the 87 -octane pipe will be <br />removed and replaced through an existing "rock guard" (without concrete breaking), also, no penetrations <br />are scheduled to be replaced as part of this repair. <br />The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br />applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection appointments (a 48- <br />hour notice is required for inspection appointments). <br />a. Piping removal and confirmation soil sampling <br />b. Primary and secondary containment piping pressure test (after surface repairs) <br />c. 24-hour hydrostatic test (or equivalent) on the impacted UDC % and 87 -octane STP sump(s) <br />d. Visual verification of appropriate communication between piping secondary containment and <br />pertinent sensors inside UDC 3/ and 87 -octane STP sumps <br />4. In addition, the following information must be submitted within 30 days after the UST removal <br />date: <br />a. Analytical results: only results that come directly from a third party California certified <br />laboratory with affixed chain of custody will be accepted by EHD <br />b. Provide Piping Hazardous Waste Manifest disposal record <br />c. Hazardous Waste Manifest for rinsate and residual product (if any) <br />5. If concrete will be broken near the tank, a secondary containment test must be performed on the <br />affected diesel UST once concrete is poured in accordance with the manufacturer's guidelines. <br />6. Secondary containment testing for the impacted piping is required six months after installation. <br />Provide 48 hours notification to the EHD when this test is scheduled. <br />San Joaquin County <br />o ,Wj.!" <br />' <br />Environmental Health Department <br />DIRECTOR <br />�• -1''•� <br />1868 East Hazelton Avenue <br />Linda Turkatte, REHS <br />{ <br />Stockton, California 95205-6232 <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />C ' �P <br />gCiFo•¢� <br />Website: www.s ov.or' /ehd <br />1g 9 <br />Kasey Foley, REHS <br />Phone: (209) 468-3420 <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />Fax: (209) 464-0138 <br />Willy Ng, REHS <br />April 4, 2016 <br />Hope Vargas o FIIE copy <br />LC Services <br />3887 N. Valentine Ave <br />Fresno, CA 93722 <br />Re: 7 -Eleven SR0073587 <br />1399 N Main Street, Manteca, CA <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to replace an underground 87 -octane product pipe between UDC 3/ and the 87 - <br />octane STP sump with OPW FlexWorks dual layer pipe (#C15A) on the underground storage tank (UST) <br />system at the above noted address. According to the permit requestor, the 87 -octane pipe will be <br />removed and replaced through an existing "rock guard" (without concrete breaking), also, no penetrations <br />are scheduled to be replaced as part of this repair. <br />The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br />applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection appointments (a 48- <br />hour notice is required for inspection appointments). <br />a. Piping removal and confirmation soil sampling <br />b. Primary and secondary containment piping pressure test (after surface repairs) <br />c. 24-hour hydrostatic test (or equivalent) on the impacted UDC % and 87 -octane STP sump(s) <br />d. Visual verification of appropriate communication between piping secondary containment and <br />pertinent sensors inside UDC 3/ and 87 -octane STP sumps <br />4. In addition, the following information must be submitted within 30 days after the UST removal <br />date: <br />a. Analytical results: only results that come directly from a third party California certified <br />laboratory with affixed chain of custody will be accepted by EHD <br />b. Provide Piping Hazardous Waste Manifest disposal record <br />c. Hazardous Waste Manifest for rinsate and residual product (if any) <br />5. If concrete will be broken near the tank, a secondary containment test must be performed on the <br />affected diesel UST once concrete is poured in accordance with the manufacturer's guidelines. <br />6. Secondary containment testing for the impacted piping is required six months after installation. <br />Provide 48 hours notification to the EHD when this test is scheduled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.