Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 1 of 1 <br />Test Method Developed By: "lank Manufacturer F Industry Standard Prof' gi <br />F Other (Specify) <br />Test Method Used By: r Pressure r Vacuum F Hydrostatic <br />7 Other (Specify) JAN 0 5 2016 <br />Test Equipment Used: VPLI <br />Equipment Resolution: O.000QL'q. <br />STP Containment for <br />Tank T4 RUL - 1 <br />STP Containment for <br />Tank T5 PUL - 1 <br />Sump Diameter/Dimensions: <br />48 in. <br />48 in. <br />in. <br />in. <br />Sump Depth: <br />61.00 in. <br />61.00 in. <br />in. <br />in. <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />22'00 <br />22'00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />10.00 <br />10.00 <br />Condition of sump prior to testing: <br />good <br />good <br />Portion of Sump Tested' <br />24 <br />24 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />r Yes r Nor NA <br />is Ycs r No f NA <br />r Yes r Nor NA <br />r Y., r Nor NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />(; Yes r Nor Nib <br />r Yes r Nor NA <br />f Yes f Nor NA <br />r Yes f No r N:1 <br />Was fail-safe verified to be <br />operational?* <br />r Yes r Nor NA <br />G Yes r Nor NA <br />r Yes r Nor NA <br />C Yes r Nor NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />5 min <br />min <br />min <br />Test Start Time: <br />10:14:00 <br />11:12:00 <br />Initial Reading (RI): <br />0.00000 in. <br />0.00000 in. <br />Test End Time: <br />10:44:00 <br />11:42:00 <br />Final Reading (RF): <br />-0.00010 in. <br />-0.00130 in. <br />Test Duration: <br />30 min <br />30 min <br />Change in Reading (RF -Rt): <br />-0.00010 in. <br />-0.00130 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />r+ Yes r Nor NA <br />a Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />(; Yes r Nor NA <br />Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. <br />WO: 2324873 <br />