Laserfiche WebLink
Comments: <br /> 4) L5: RUL Fill Sump Fuel Alarm on 2/17116,see attached work order. L5:RUL Fill Sump Fuel <br /> Alarm on 3/14/16,site has called in and is awaiting repairs. <br /> `NOTE*Work order dated <br /> 1/21/16 to close out open alarm from February 2016 inspection. <br /> 5) L5: RUL Fill Sump Fuel Alarms on 2/17/16 & 3/14/16. L6: Prem Fill Sump Fuel Alarm on <br /> 3/5/16 <br /> 10) SB989 retest on 1/19/16 <br /> 15) Employees trained on 03/15/2016. See attached training roster. <br /> Items Requirint Follow-Uv Actions: <br /> 2) L5: Fuel Alarm,site has called in and is awaiting repairs. <br /> 4) L6:Prem Fill Sump Fuel Alarm on 3/5/16,no documentation onsite,contacted contractor. <br /> �rT 1 it 20% <br /> HEALTH <br /> ENIVIrtul'41- <br /> ncppRTMENT <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator,who possesses <br /> a current "California UST System Operator" certification issued by the International Code Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator,but not to <br /> the State Water Resources Control Board. The UST Operator must alert the UST Owner or Operator of any <br /> condition discovered during the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or, if approved by the local <br /> agency,off-site at a readily available location. <br /> Page 2 of 2 <br />