My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2015 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2015 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 2:07:11 PM
Creation date
8/5/2019 10:44:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2016
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1399\PR0231435\2016 RETROFIT PLANS SR0074936 .PDF
QuestysFileName
2016 RETROFIT PLANS SR0074936
QuestysRecordDate
5/22/2017 9:16:03 PM
QuestysRecordID
3392977
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name: 7-1119976 Date: 4118/2016 <br /> Facility Address: 1399 N.MAIN ST. <br /> City:MANTECA A Zip Code: 95336 <br /> Designated UST at qonductigilhe Inspection: Laura Gomez <br /> International C de c' i ti #: 8344748 Expiration Date: 4/14/2017 <br /> ature. Phone: (949)460-5200 <br /> V—VM N=No,NA-Nat Appricable <br /> Item ONIT G PANEL 1 ALARM HISTORY Y N NA <br /> Monitoring System is pow on an in pro r operating mode X <br /> 2 Monitoring system is not currently sh w' any alarms or warnings. X <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the Designated UST X <br /> Operator, (Attach a copy of the alarm history report/log to this form if available.) <br /> 4 Each alarm for the previous month has been responded to appropriately. X <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. X <br /> 5a - List all tank-top sumps where alarms occurred in the past month: <br /> LS:RUL Fill Sump <br /> Note:Sumps where an alarm has occurred in thepast month must be inspected unless a qualtlled service technician responded to,and properly <br /> addressed,the cause of the alarm.Attach documentation verifying appropriate service to this report.If sump inspection is required.record results <br /> in item 6.below. <br /> UST SYSTEM INSPECTION <br /> 0 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note. Visual inspection pj'sumps is only required in sumps where an alarm hay occurred in the past month for which there is noswwce retard. <br /> Y N Y N <br /> Sump Location: "'^ Sump Location: VA ,f <br /> Sump Location: "'" x`' y Sump Location: NIA <br /> -_ M <br /> Sump Location: "t^ r. Sump Location: <br /> 7 Spill containment structures are free of water,debits,and hazardous substance, <br /> Y N NA Y I N INA <br /> Tank-87 X <br /> Tank-91 X <br /> 8 Under-dispenser containment area,,,are ti-ee of water,debris,and hazardous substance, e c o e <br /> Y N NA Y <br /> Dispenser-112 X <br /> Dispenser-3/4 X <br /> ENVIRONMENAL I-lE <br /> PAPERWORK INSPECTION Y N N <br /> 9 Monitoring system certification has been completed within past 12 months. X 10/7/15 <br /> 10 Secondary containment tests have been completed within the required timeframe. X 1211815 <br /> 11 Spill containment structure(bucket)testing was completed within the past year. X 10/715 <br /> 12 Tank tightness tcsting was completed within required timeframe. X NIA <br /> 13 Line tightness testing was completed within required timeframe. X NIA <br /> 14 Other required testing/maintenance was completed within required timeframe.(List test/maintenance items below) <br /> TeyWaintenance: X NIA <br /> TestlMaintenance: _ X N/A <br /> Test/Maintenance: X NIA <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility employees have received the required on-the-job training within the past year. X <br /> 16 All facility employees hired within the past 30 days have received the required on-the-job training. X <br /> Note: Any answer of"N"should be explatned in the comment section on the following page,and will require follow-up <br /> action. <br /> Page l of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.