Laserfiche WebLink
Comments: <br />2) ISD Gross Pres Warn <br />4) No priority alarms <br />*NOTE* Attached work order to close out open alarm from May 2016 <br />10) Initial SB989 test on 12118/15_ SB989 test completed on 1119116. <br />15 See attached training, roster. <br />Items Reauirine Follow -Up Actions: <br />ir- ALT <br />EN <br />Instructions: <br />DEPARTMENT <br />Monthly visual inspection of the UST system must be conducted by a Designated UST Operator, who possesses <br />a current "California UST System Operator" certification issued by the International Code Council. <br />A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator, but not to <br />the State Water Resources Control Board. The UST Operator must alert the UST Owner or Operator of any <br />condition discovered during the monthly visual inspection that may require follow-up actions. <br />The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br />attachments for the previous 12 months, The records must be maintained on-site or, if approved by the local <br />agency, off-site at a readily available location. <br />Page 2 of 2 7-11-19976 06/08/2016 <br />