My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used for land application which was developed for warehouse space. Three additional <br /> wells which were installed as part of a petroleum fuel leak investigation exist at the <br /> processing facility and may be useful for determining background groundwater <br /> conditions. <br /> Recently, the Discharger installed a reverse osmosis unit to replace their water softening <br /> unit, and reduced the number of cleaning cycles, resulting in better quality wastewater with <br /> a specific conductance of 1,530 µmhos/cm, down from 2,200 µmhos/cm. This <br /> improvement notwithstanding, the water supply specific conductance before use by the <br /> Discharger is in the range of 470 µmhos/cm to 660 µmhos/cm, so there is approximately <br /> a three-fold increase in water mineralization. <br /> These waste discharge requirements contain a time schedule for installation of additional <br /> groundwater monitoring wells, preparation of an Operation and Maintenance Plan with an <br /> integral cropping plan for the land application areas, and improvements to the land <br /> application areas. <br /> C:Troject FiIn\SitaTal Nat_FroducuVNFO.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.