My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D <br /> San Joaquin Workplan <br /> EPA Method 503.1 or 602/8020 for BTEX <br /> EPA Method 8015 (modified) for Total Petroleum Hydrocarbons <br /> as gasoline <br /> The laboratory analyses will be focused on the detection of compounds <br /> commonly associated with gasoline. <br /> 5.5 ,DECONTAMINATION <br /> R <br /> Between sampling attempts, the sampler will be disassembled and washed in <br /> a trisodium phosphate (TSP) solution, rinsed twice with purified water and <br /> reassembled with brass rings to minimize the potential of spreading contami- <br /> nants among samples, if any were present. <br /> 5.6 DRILLING SPOILS <br /> ' Auger cuttings from the drilling operation will be placed in drums and retained <br /> on-site.The results of chemical analysis will be used to evaluate the appropriate <br /> disposal of any contaminated auger cuttings by CNP. <br /> 6.0 PROJECT SCHEDULE <br /> Augeas Corporation is prepared to begin this study on February 25, 1992.It is <br /> estimated that the proposed scope of services will require approximately three <br /> to six weeks to complete. <br /> Project Number: JOAQ22192 <br />
The URL can be used to link to this page
Your browser does not support the video tag.