M KLEIN FELDER <br /> comer of the rapid infiltration area and McKinley Avenue. Please see the revised Plate 5 <br /> attached. <br /> Both of the proposed upgradient well locations are in-line with Wells W-2 and W-4, this <br /> alignment makes interpretation of the groundwater elevation more difficult. The proposed well <br /> location shall be placed in a location that is not in-line with the existing wells. <br /> The additional upgradient monitoring well installed near the 17.6-acre rapid infiltration area will <br /> be installed near the southeast comer of the rapid infiltration area and McKinley Avenue. The <br /> well location will not be in-line with W-4. <br /> The addendum recommends reconfiguring the 16.0-acre land application area to prevent <br /> wastewater application in the area of L-1. That is acceptable with written confirmation from <br /> California Natural Products that a berm will be installed and wastewater will not be applied <br /> within 50 feet of the well. <br /> California Natural Products shall provide a written confirmation statement that a berm shall be <br /> constructed 50 feet from L-1 to prevent the flow of application water near the monitoring well. <br /> The addendum failed to provide a schedule for implementation of the workplan. California <br /> Natural Products shall install the additional well by 26 December 2002. By 24 February 2002 <br /> the well installation report shall be submitted. <br /> The RWQCB again requested a time schedule for the implementation of the workplan, yet has <br /> failed to take notice of the Anticipated Schedule included in the Kleinfelder's original workplan, <br /> Section 4, page 9. The following time schedule for the implementation of the workplan shall <br /> apply: <br /> Anticipated Schedule Task <br /> Week 0 Submittal of workplan to RWQCB <br /> Week 0-2 RWQCB review and comment on workplan* <br /> Week 2-4 Revisions if needed and RWQCB approval of workplan* <br /> Week 4-6 Permitting and subcontractor scheduling** <br /> Week 6-7 Monitoring well installation and development (by December 26, <br /> 2002) <br /> Week 8 Monitoring well sampling <br /> Week 8-10 Laboratory analysis** <br /> Week 10-12 Report preparation and submittal to California Natural Products <br /> February 24, 2003 Submittal of groundwater monitoring well installation report to <br /> RWQCB by California Natural Products <br /> * Kleinfelder has no control over the time required by a regulatory agency to review and approve a workplan and <br /> permit applications. <br /> **Kleinfelder has no control over the time required or time frame that subcontractors place on outlined tasks. <br /> C20-4587-OI.MNI/STO21,262 Page 3 of 4 <br /> Copyright 2002,Kleinfelder,Inc. October 11,2002 <br />