My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K4 KLEINEELDER <br /> A-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> A-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> accomplished by grouting the boring with a cement based grout material or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner. If requested, Kleinfelder can coordinate disposal <br /> of soil and water after analytical results are available. <br /> A-3 GROUNDWATER WELL INSTALLATION <br /> A-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> • The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 PVC <br /> pipe. <br /> • The wells are constructed in 6- or 8-inch diameter borings. <br /> • Well screen sections are perforated with 0.010- or 0.020-inch factory-cut slots. <br /> • The wells are generally screened from 5 feet above to 15 feet below first groundwater. <br /> The screen length is reduced if an aquitard with a minimum thickness of 5 feet is <br /> encountered. If an apparent aquitard is encountered, the well is usually terminated 1 to 2 <br /> feet into the aquitard. Effort is made not to screen across two aquifers. If confined <br /> aquifer conditions or high vadose zone contamination are encountered; the well screen is <br /> usually not set above the depth of first encountered groundwater. Wells are usually not <br /> set in areas of suspected significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> 204587-02.WP2/2002R489 Page A4 <br /> Copyright 2002,Kleinfelder,Inc. June 6,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.