My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: R Check this box if tank gauging iu5 sYCEI�of <br /> r Check this box if no tank gauging or SIR equipment is installed. �® <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. NOV 2 4 201,1 <br /> Complete the following checklist: ENVIRO^1 1't <br /> MPNIT <br /> Yes No* Has all input wiring been inspected for proper entry and termination, including testing for group 'V <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes r No* Was accuracy of system product level readings tested? <br /> Yes r No* Was accuracy of system water level readings tested? <br /> Yes No* ere all probes reinstalled properly? <br /> • Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate:P 3 g.p.h.; r 0.1 g.p.h; I 0.2 g.p.h. <br /> • Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes r No* Was the testing apparatus properly calibrated? <br /> * Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> • N/A <br /> Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> • N/A monitoring system is disabled or disconnected? <br /> Yes No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> • N/A monitoring system malfunctions or fails a test? <br /> Yesr No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ro N/A <br /> • Yesr No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.