Laserfiche WebLink
k <br />SWRCB, January 2002 <br />Page 1. <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: 7 -ELEVEN #19976, MKT 2368 <br />Date of Testing: 10/08/2010 <br />Facility Address: 1399 N. MAIN ST. @ NORTHGATE , MANTECA, CA, 95336 <br />Facility Contact: BEN <br />Phone: (2 0 9) 23 9-3252 <br />Date Local Agency Was Notified of Testing: 09/28/2010 <br />Name of Local Agency Inspector (if present during testing): thuy tran <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY , INC. <br />Pass <br />Fail <br />Technician Conducting Test: <br />CHARLES FERRUCCI <br />Component <br />Pass <br />Credentials: <br />Not <br />Tested <br />CSLB Licensed Contractor <br />Spill Box 4 REG FILL <br />SWRCB Licensed Tank Tester <br />❑ <br />❑ <br />License Type: 7 43160 <br />License Number: 743160 <br />❑ <br />❑ <br />Manufacturer <br />Manufacturer Training <br />Component(s) <br />Date Training Expires <br />pomeco <br />SPILL BUCKET <br />❑ <br />❑ <br />❑ <br />❑ <br />- <br />❑ <br />11 <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repair <br />Made <br />Spill Box 4 REG FILL <br />El <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />F -1 <br />Spill <br />Spill Box 5 PRE FILL <br />Fx] <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />- <br />❑ <br />11 <br />El <br />EI <br />LI <br />F1 <br />F1 <br />El <br />F] <br />El <br />El <br />- <br />Fl <br />F] <br />o <br />1:1 <br />E <br />1:1 <br />1:1 <br />1:1 <br />- <br />E <br />0 <br />El <br />El <br />11 <br />El <br />El <br />El <br />El <br />El <br />El <br />Ej <br />F7 <br />F1 <br />El <br />E] <br />El <br />El <br />El <br />1:1 <br />1:1 <br />1:1 <br />Ll <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />El <br />Ll <br />Ll <br />El <br />El <br />1:1 <br />El <br />El <br />1 <br />10101 <br />El <br />I El <br />1 <br />1:11 <br />El <br />E <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />water taken off site <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: 10/08/2010 <br />