My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
© P► W_40, Attestation No. P 4535 <br />`r"""" Jrssir D. Andrada <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase 1 by OPNN', Inc <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems. This training <br />course does not eliminate the need to stiichy adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery system and EVR PHASE I System. Ail nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O P 1%" -* <br />v Attestation No. P 4502 <br />Derek Aponte <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance ornozzles, vapor recovery system and EVR PHASE system. This training <br />course does not eliminate the need to sbxtty adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONC Y to tested named individual <br />O F3P i%"- Attestation No. P 4519 <br />° ' ° E" `°"^•^ Gene Bobineaux <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />andior maintenance or'nozzls vapor recovery system and EVR PHASE 1 systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O F3p W_ Attestation No. P 4507 <br />Brent Bowen <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by DPW of your Installation <br />and/or maintenance of nozzles vapor recovery system and EVR PHASE I system. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery system and EVR PHASE I System. A# nozzles, <br />vapor recovery system and EVR PHASE I system must be installed and maintained in accordance with <br />manufacture- instructions and procedures. Attestation applies ONL Y to tested named individual <br />Attestation No. P 4523 <br />•� "'"� Michael Butters <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance or nozzles, vapor rem very systems and EVR PHASE I system. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O P vV Attestation No. P 4526 <br />Curtis Carpenter <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training Course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery system and EVR PHASE I system. This training <br />Course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzle, vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be instalW and maintained in accordance with <br />manufacturer instructions and pnzedures. Attestation applies OX Y to tested named individual. <br />O F31 W—:* Attestation No. P 4546 <br />Brian J. Chalmers <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, -sic. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Comp(etion of this training course does not created warranty or guaranty by OPW of your installation <br />and/or maintenance ornozzles, vapor recovery system and EVR PHASE I systems. This training <br />course does not eliminate the need to strrclly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery system and EVR PHASE 1 System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O P Vv-�* Attestation No. P 4536 <br />,' rmf )r°rr , Griels Copp <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a wa, ranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery system and EVR PHASE I system. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance —th <br />manufacturer instructions and procedures. Attestation applies MY to tested named individual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.