My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� Pill � Attestation No. P 4497 <br />�J" Chris Reeves <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor rem very systems and EVR PHASE I systems. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery systems and EVR PHASEI Systems. All nozzles <br />vapor recovery systems and EVR PHASE I Systems most be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />_....._....._._ .. <br />O Pill W- Attestation No. P 4547 <br />•�^�^ Edwin Lee Reeyes <br />VR -102- Walton Engineering Inc <br />Attended Installation "Training for EVR Phase 1 by OPW, Inc <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O Pill ivv- Attestation No. P 4544 <br />Ismael Rios <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPNN', Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />andror maintenance of nozzles. vapor recovery systems and EVR PHASE I systems. This training <br />course does not eliminate the need to slrialy adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery systems and EVR PHASE I Systems. A# nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained m accordance with <br />manufacturer Instructions and procedures. Attestation applies OK Y to tested named individual <br />0 P Vv- Attestation No. P 4505 <br />Anthony Q. Rosario <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />Installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONLY to tested named individual. <br />O P Vv-' Attestation No. P 4527 <br />Brian Roth <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW or your installation <br />and/or maintenance d ncvzks, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASEI Systems. M nozzles, <br />vapor recovery systems and EVR PHASEI Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />P Attestation No. P 4529 <br />Darren Sciume <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance o✓nozztes, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to 5&xWy adhere to manufacturer instructions and procedures when <br />insfaping and maintaining nozzles vapor recovery systems and EVR PHASE I Systems. A# nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be Installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />Q P vv_z Attestation No. P 4513 <br />• oovfP;corw•v Linda Steiger <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your Installation <br />and/ormaintenance crnozzles, vapor recoverysystems and EVR PHASEI.systems This training <br />-ours' does not eliminate the need to strictly adhere to manufacturer inStr rbons and procedures when <br />Mstatlirg and maintaining nozzles, vapor rerovevy systems and EVR PHASE I Systems All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be Installed and maintained In accordance with <br />manufacturer Instructions and procedures. Artestation applies oNt Y to tested named and-duai <br />VR -102 - <br />Attestation No. P 4521 <br />Tommi Steiger <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty orguaranty by OPW of your Installation <br />and/or maintenance be nozzles, vapor recovery systems and EVR PHASE I systems. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be instated and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONt Y to tested named individual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.