My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 3:13:32 AM
Creation date
8/6/2019 2:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Site Address: 1399 N. MAIN ST. Date of Testing/Service: 11/06/2009 <br /> @ NORTHGATE <br /> F. In-Tank Gauging / SIR Equipment <br /> ❑x Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑NoWas accuracy of system product level readings tested? <br /> 1:1 Yes ❑No` Was accuracy of system water level readings tested? <br /> [Ft—]Yes ❑No` Were all probes reinstalled properly? <br /> ❑No" Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑x Yes ❑No ❑N/A (Check all that apply)Simulated leak rate: X 3 h 0.1 h 0.2 h <br /> ❑ 9.p. ❑ g.p. ❑ g.p. <br /> ❑X Yes ❑No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑x Yes ❑No' Was the testing apparatus properly calibrated? <br /> FX Yes ❑No" ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No' ❑X N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No• ❑X N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No' ❑X N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No' ❑X N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.