My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 3:13:32 AM
Creation date
8/6/2019 2:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2248462 <br />Site Address: <br />'F. in -Tank Gauging / SIR Equipment: <br />Date or,restigo/seiNicing:0_11 <br />Check this box if tank gauging is used only for inventory'contror. <br />Q Check this box if no tank gzeuging or SIR equipment is instarlecl. <br />This section must be completed iFin-tarok gau gilt = c <br />.0, b b 6 cluip,nent is used to perform leak detection monitoring. <br />Complete the following checkrist: <br />WNo <br />* Has all input wiring been inspected for proper entry and [ermination, including testing for ground faults? <br />* Were al! tank gauging probes visually inspected for damage and residue btuirdup? <br />' Was accuracy ofsystem product revel readings rested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />Were al! items on the equipment manufacturer's maintenance checklist cattplcted? <br />"-In theSectinn lit below, describe how and when these deliclencies were or will be corrected. <br />G_ Lime Leak Detectors (LLD): O Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No• For equipment start-up or annual equipment c ideation, was a leak simulated to verify LLD perfotmance7 <br />Q NIA (Check all Akar apply) Simulated leak rate: 3 g.p.h.; ❑ p.1 g,p,h 110,2 g p h <br />❑ No* Were all LLDs confirmed operationar And accurate within regulatory requirements? <br />Cl No* Was the testing apparatus properly calibrated? <br />yes ❑ No* For mechanical LLDs, does the LLD restrict product flow <br />0 N/A if ir detects a leak? <br />I Yes L3 • For electronic LLDs, does the turbine automatically shut off if the LI,D detects a leak? E <br />:fd NIA <br />Yes 4 For electronic LLDs, does the turbine automalit ally Sfttlt off If tiny portion of the monitoring system is disabled <br />NIA ordisconnected7 <br />Yes D No+ For electronic 1.Llls, does the turbine automatically shut oft' if any portion of the monitoring system <br />NIA marPunctions or faits a test? <br />Yes _❑ N/A No Forel"Irunre LLDs, have all accessible wiring connec <br />k1tions been visuairy inspected? <br />yes D No' Were <br />n the Seall items on the equipment manufacturer's maintenance checklist completed? <br />rtioo N, below, describe how xnd when these de[lciencJes ►vete of wfEl be corrected. <br />Comments: <br />Tanknology Inc. 8900 Shoal Creek, Building 200 Austin, Texas 78757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.