Laserfiche WebLink
nitoring System Certification <br /> Site Address: 1399 N. MAIN ST. Date of Testing/Service: 07/13/2004 <br /> @ NORTHGATE <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 19.05 <br /> Complete the following checklist: <br /> El Yes NoIs the audible alarm operational? <br /> ❑X Yes E]No' Is the visual alarm operational? <br /> ❑X Yes No` Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ <br /> interfere with their proper operation? <br /> Yes No` X N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Ox Yes No' NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑x Sump/Trench Sensors; ❑X Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑X Yes ❑No <br /> ❑X Yes ❑No' NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? 90 <br /> ❑ Yes- Q No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes` Q No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> �X Yes ❑No` Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> QX Yes F—]No` Is all monitoring equipment operational per manufacturers'specifications? <br /> •In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03/01 <br />