Laserfiche WebLink
Sep-04-96 10:01A THORNTON & SON 408 946 1015 P.03 <br /> The Total Containment tanks being installed do have striker plates,and will be secured using <br /> deadmen anchors. I've enclosed additional cut sheets detailing both. <br /> The Total Containment secondary piping will be graded downward from the dispenser sumps to <br /> the turbine sumps at no less than 1/8"per one foot. <br /> I've enclosed a copy of Marathons current workmen compensation insurance certificate, and a <br /> copy of their contractors card,with expiration date. However the card has expired, and the <br /> issuance of a new card is 6 months behind. The status of their contractors license can be verified <br /> by calling the CSLB at 1-800-321-2752. <br /> If you have any questions please feel free to give me a call at the above number. <br /> Sincerely, <br /> Brian Thornton <br /> Agent <br /> Pg. 2 <br />