Laserfiche WebLink
' � � �� KLEINFELDER <br /> ' subsurface utilities buried under private property will not be marked by the public <br /> utility companies contacted by USA. USA will be contracted at least 48 hours <br /> ' prior to performing field work. <br /> ➢ Kleinfelder is not responsible for safety considerations related to the Chevron <br /> and PG&E Pipeline easement. The selected excavation contractor (not a <br /> ' subcontractor of Kleinfelder), Chevron Pipeline Company and PG&E Pipeline <br /> Company will be responsible for safety related to their pipelines. <br /> ' ➢ Backfill, compaction and compaction testing are not part of the proposed <br /> services, but must be supplied by the selected backfill contractor. <br /> ➢ Based on preliminary information provided by RAH Environmental, Kleinfelder <br /> assumes the waste will be profiled as a non RCRA-hazardous waste and <br /> ' acceptable at Forward Landfill or Altamont Landfill (Class II Landfills). Actual <br /> results/classification may differ. Classification other than non-hazardous or non <br /> RCRA-hazardous waste may incur disposal to differing landfills (Class 1) and will <br /> substantially increase disposal costs through profiling, transportation and <br /> disposal costs. <br /> ' ➢ Kleinfelder is not responsible for geotechnical considerations or safety related to <br /> proposed excavation activities in and around the Chevron and PG&E pipelines. <br /> Specifics referenced in this workplan are for informational purposes only. <br /> ' Information within this workplan have been supplied to both PG&E and Chevron <br /> and have been supplied to the general contractor. Based on the information and <br /> methodology forwarded to Chevron and PG&E, and the information summarized <br /> ' in this workplan, Kleinfelder understands there are not outstanding safety or <br /> geotechnical issues with either PG&E or Chevron. Kleinfelder has relied on <br /> information provided from PG&E and Chevron for the methodology and specifics <br /> t mentioned with excavation in and around said pipelines. The excavation general <br /> contractor is responsible for adhering to OSHA, PG&E and Chevron pipeline <br /> criteria, as well as the "standard of care". <br /> 1 ➢ Kleinfelder is not responsible for the site safety of others. <br /> ' ➢ Kleinfelder is not responsible for supervising or directing activities of the general <br /> excavation contractor. <br /> ➢ Inclimate weather may impact the schedule and increase costs <br /> ➢ Two copies of all documents will be delivered to the client. Additional copies can <br /> be provided for a fee of $50 per copy. <br /> ➢ Client meetings and revisions to the reports are not included in the budget <br /> ' estimate, but can be provided on a time and materials basis at the client's <br /> request. <br /> ' 44843.T04/STO5R1333/DH:ly Page 15 of 17 <br /> ©2005 Kleinfelder, Inc. October 25, 2005 <br />