Laserfiche WebLink
k'■ KLEtNFELDER <br /> The following is a summary of analytical results from soil samples collected on <br /> September 30, 2005 during the bellhole excavation by Line 401: <br /> tPG&E Line 401 Soil Sampling Results <br /> Sample Sample TPH-G TPH-D TPG-0 B T E X <br /> ID Depth (mg/kg) (mg/kg) (mg/kg) (µg/kg) (µg/kg) (µg/kg) (µg/kg) <br /> (feet) <br /> 1 BH 7'01- 7 4700 1,700 2,600 8,700 3,800 12,000 72,000 <br /> 7' <br /> BHL401- 10 ND (<5) ND (<10) ND (<1) 29 ND (<5) 7.0 21 <br /> ' 10' <br /> Notes: <br /> BHL401 bellhole Line 401 <br /> TPH-G total petroleum hydrocarbons as referenced to gasoline <br /> TPH-D total petroleum hydrocarbons as referenced to diesel <br /> TPH-O total petroleum hydrocarbons as referenced to oil <br /> BTEX benzene, toluene, ethylbenze, total xylenes <br /> mg/kg milligrams per kilogram (parts per million) <br /> µg/kg micrograms per kilogram (parts per billion) <br /> Based on PG&E comments, during excavation of Line 401 there will be a need to slope <br /> the soil 1 to 1 with three feet excavated on each side of the pipe. PG&E has forwarded a <br /> 1 backfill specification guideline which has been forwarded to the excavation contractor <br /> Pacific States, including other technical information from PG&E. Backfilling will be <br /> conducted under PG&E oversight as per PG&E general guidelines. PG&E has indicated <br /> backfill beneath their pipes can be jetted or washed beneath their pipe with mechanical <br /> compaction along the sides of the pipe in 12 to 18 inch lifts. PG&E has indicated that <br /> Line 401 can span 150 feet, unsupported, safely. It will be up to the contractor to decide <br /> what intervals to expose Line 401 within this safety specification. Kleinfelder anticipates <br /> the pipe will need to be excavated in sections, and each section backfilled prior to <br /> excavation of the next section of pipe. A sample of the backfill material is requested to be <br /> submitted to PG&E for testing for their criteria. Kleinfelder anticipates import material can <br /> be obtained from a local supplier. It will be the excavation contractors responsibility to <br /> conduct the work according to OSHA guidelines and PG&E specifications. Final removal <br /> of soil in and around the PG&E pipeline will be directed by PG&E personnel. Kleinfelder <br /> will collected confirmation soil samples as directed by PG&E and as necessary. <br /> Kleinfelder however, is not providing oversight to the general contractor. PG&E has <br /> indicated that soil samples should be screened using a photo-ionization detector (PID). A <br /> clean-up goal of 100 parts per million using a PID has been tentatively proposed by <br /> PG&E during removal of soil around Line 401. <br /> Confirmation Soil Sampling <br /> Kleinfelder proposes collection of approximately thirty (30) discrete bottom excavation <br /> soil samples based on a 50 foot grid pattern. Kleinfelder estimates the average depths <br /> outside of the pipeline easement areas to be approximately 5 to 13 feet bgs as shown <br /> 44843.T04/STO5R1333/DH:ly Page 7 of 17 <br /> ©2005 Kleinfelder, Inc. October 25,2005 <br />