Laserfiche WebLink
Case Closure Summary Page <br /> Leaking Underground Fuel Storage Tank Pro,,..am <br /> III Release and Site Characterization Information (continued) <br /> Maximum Docu760 <1 <br /> inant Concentrations --Before and After Cleanup <br /> Contaminant pm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> 7 <br /> 11 <br /> fter Before After Before After Before After <br /> TPH (Gas) 3.1 <0.050 Ethylbenene 0.61 <0.005 0.025 <0.0005 <br /> TPH(Diesel) 110 <1 3.6 <0.050 Xylenes 7.3 <0.005 0.149 <0.0006 <br /> TPH(Motor Oil) 92 3.8 17 <1.0 MTBE 32 0.14 0.002 <0.001 <br /> Benzene 0.21 <0.005 0.017 <0.0005 1,2-DCA <0.005 <0.01 0.0038 <0.0005 <br /> Toluene 0.63 <0.005 0.037 <0.0005 <br /> Comments: Soil Before result for: TPH(Gas)is from P3-10 collected August 31, 1999; TPH (Diesel) is from P1-5 collected <br /> August 31, 1999; TPH (Motor Oil) is from Piping 4 collected February 24, 1999; benzene is from P12-15 collected October <br /> 10, 2003; toluene, ethyl benzene, and xylenes are from TK2-N collected February 24, 1999; MTBE is from P3-10 collected <br /> August 31, 1999, and 1,2-DCA is from P7-45, 55, and 60 collected June 6, 2000. Soil After result for: TPH (Gas), TPH <br /> (Diesel), toluene, ethyl benzene, xylenes, and 1,2-DCA are from P8 through P12 collected October 10, 2003; TPH (Motor <br /> Oil)is from P9-5 collected October 9, 2003; Benzene is from P12-25, P12-40, and P12-50 collected October 10, 2003; and <br /> MTBE is from P12-15 collected October 10, 2003. Water Before results for: TPH (Gas), benzene, toluene, ethyl benzene, <br /> and xylenes are from MW-5R collected on November 12, 2008; TPH (Diesel)and TPH (Motor Oil)are from P9-65 to 68 <br /> collected October 9, 2003; MTBE is from MW-1 collected June 16, 2000; and 1,2-DCA is from MW-5R collected April 10, <br /> 2007. Water After results for: TPH (Gas), benzene, toluene, ethyl benzene, xylenes, and 1,2-DCA are from MW-5R <br /> collected December 5, 2008, and January 22, 2009; TPH (Diesel)and TPH (Motor Oil)are from MW-4 and MW-5 collected <br /> on November 21 2006• and MTBE is from MW-1 collected on November 12 2008 <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None <br /> Should corrective action be reviewed if land use changes?Yes <br /> Monitoring/Vapor wells decommissioned: No Number Decommissioned: 1 Number retained: 5 <br /> List enforcement actions taken: NOR 06/03/99 and 04/25/07 <br /> List enforcement actions rescinded: None <br /> V. Local Agency Representative Data <br /> Name: Margaret Lagorio, REHS Title: Program Coordinator <br /> Signature: 22i=2t� Date: <br /> VI. Central Valley Regional Water Quality Control Board (RB)Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: James L.L. Barton Response: <br /> Title: Associate Engineering Geologist <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official <br /> site file. <br />